hamedandClaude Opus 5 26a8e53b34 feat(admin): catalog groups and appointment segments editors
Tasks 04 and 05 shipped working engines that a clinic could only reach through
the API. Both now have the panel that makes them usable.

Groups tab
- Inline min/max per group, saved on blur, with the meaning of an empty maximum
  spelled out next to the field rather than left as folklore
- Incompatible / prerequisite rows; the prerequisite-cycle 422 surfaces the
  server's own message, which is more precise than anything generic
- A live preview that calls the same service-selection/validate the public site
  calls, debounced 400ms. Two separate calculations would eventually show the
  operator and the patient different numbers
- The breakdown table shows which item was counted as the anchor and which as
  additional, so a surprising total explains itself

Segments tab
- Sequence, duration source, patient-present and mergeable per segment, plus
  resource requirements with an explanation attached to each occupancy mode
- A timeline bar whose widths are proportional to duration, with segments the
  patient is absent for drawn faded. That contrast is the whole point of task
  05: the waiting segment holds the room but frees the operator
- "No eligible resource" renders with a link to add one — an error with no
  route forward is a dead end

Task 05's checklist had been left on "not started" this whole time even though
its code shipped with the task; it is now filled in against reality.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-07-31 19:42:24 +03:30
hamedandClaude Opus 5 22c89fbae4 feat(plan): multi-segment appointments with per-segment resource requirements
Section 7 of the design document, and the reason the whole resource layer exists.
A laser session is not one block: numbing cream (5 min, room + operator), waiting for
it to work (30 min, room only), the laser itself (20 min, room + operator + device),
aftercare (5 min, room + operator). Under the single-interval model the operator is
locked for all 60 minutes while actually working 30 — half the capacity thrown away.

AppointmentPlanBuilder turns (service, selected items, branch, patient) into a plan:
segments with offsets, durations and resource requirements. It deliberately assigns
no absolute time and no specific resource — that is the next task. This only produces
the *shape* of the appointment.

Segment duration comes from one of two sources. A fixed segment carries its own
number; an item-driven one gets its duration from task 04's DurationCalculator, so
"the laser itself" grows with two treated areas while "waiting for the cream" does
not. One number could not have expressed that.

Three contracts worth stating:

- A service with no segment templates falls back to a single continuous segment
  requiring the doctor resource — exactly today's behaviour. Without it every
  existing service would have become unplannable overnight.
- A segment with no requirements is valid: "waiting at home" consumes time but
  occupies nothing.
- same_gender_as_patient with an unknown patient gender is a 422, not a silently
  dropped requirement. Dropping it quietly would route the patient to a resource the
  clinic said must not serve them.

When no resource qualifies, the error names the role, the skill and the branch —
"no female operator with the skill «Alexandrite laser» is available at «Central»" —
rather than an empty result the caller has to interpret (section 10).

occupancy_offset carries each requirement's setup/cleanup minutes for the availability
engine. It is taken as the maximum across candidates, because the builder does not yet
know which resource will be picked and under-reserving means the next appointment
lands on top of the cleanup.

11 tests covering the document's reference example (offsets 0/5/35/55, total 60),
item-driven scaling, the no-template fallback, all three gender-constraint outcomes,
merging and both caps. 1186 tests overall. phpstan back at its 14-error baseline;
slot-mode frozen contract green.

The admin segments page is not built; the checklist records it with a target. The
backend and preview endpoint are complete and consumable without it.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-07-30 21:07:30 +03:30
hamed 70739691d1 Add checklists for tasks 11 to 14 covering credit ledger, treatment course, cancellation policies, and event utilization
- Created checklist for task 11: Package and Credit Ledger
- Created checklist for task 12: Treatment Course
- Created checklist for task 13: Cancellation Policy, No-Show, and Waitlist
- Created checklist for task 14: Domain Events and Utilization Reports
2026-07-30 12:12:45 +03:30
hamed 021d0eb6b2 feat: implement cancellation policy, no-show tracking, and waitlist management
- Add implementation notes for cancellation and waitlist features.
- Create task documentation outlining goals, current status, and acceptance criteria for cancellation policy and resource utilization reporting.
- Establish architecture for domain events and outbox pattern to ensure reliable event publishing.
- Define database schema for domain events and necessary queries for resource utilization and plan accuracy reports.
- Implement detailed implementation notes covering edge cases, testing strategies, and documentation requirements.