Files
clinicpro/docs/new_feture/taskes/task-14-events-utilization
hamedandClaude Opus 5 a8020e3c20 docs: reconcile checklists with what the last passes actually built
Rows closed by the resource-strategy and blocking work: task 06's picker
interface and four strategies, task 07's ad-hoc blocking and 409 recovery, and
task 12's same-as-previous preference, which had been blocked on task 06's
missing strategies since it was written.

Tasks 13 and 14 both carried the flaky-suite caveat against their final review;
that flake has a diagnosed cause and a fix, so both now say so instead.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-07-31 20:53:02 +03:30
..